Green Park Villa

Scaffolding and maintenance of external wall sewage pipe works

Sewage hose cross fork leaking

Replace the sewage hose cross fork

Repair the old tiles on the Shiya countertop of the air-conditioner

Before repair

After chiseling and criticizing

Paint waterproof material

Glue the tiles

Maintenance of the 2nd to 13th floor drains of the building

Repair the corridor bricks of each floor of the building